Equipping a spare parts warehouse

Building area 757 m²
Storage area 1553 m²
Area using factor 2.05
Pallet racks for 156 pallet spaces

Our customer opened a new spare parts warehouse in Kiev, and he needed an efficient storage system. We developed it – a two-level mezzanine floor deck of the OSB sheets, and shelves made of chipboard. The use of the mezzanine for spare parts storage allowed to use the maximum available space warehouse with no loss in cargo handling speed. At an area of 757 m² we reached twice the useful area of the storage. 

Complex organization of spare parts warehouse

The warehouse was also equipped with a small pallet system for 156 pallet spaces for storing pallets with goods that have just arrived at the warehouse. Packing area was equipped with 3 Master-type shelving units. Our shelves are involved at every stage of warehouse operation: arrival of new goods → their distribution and storage → assembly and shipment of orders. 

Video from a mezzanine case study for a warehouse of auto parts in Kiev

Building area – 757 m²
Building area – 757 m²
Useful storage area – 1553 m²
Useful storage area – 1553 m²
Mezzanine rack height – 4900 mm
Mezzanine rack height – 4900 mm
2 ladders to access the upper level
2 ladders to access the upper level
Floors made of OSB sheets
Floors made of OSB sheets
The cargo is delivered to the second floor through the gate
The cargo is delivered to the second floor through the gate